EPRI
Tech Portal
Tech Portal
Tech Portal
  • Home
  • Tech Channels
  • Innovation Areas
  • Cross-Cutting Technology
  • Suggest a Developer
  • About
  • Log In/Register
  • Home
  • Tech Channels
  • Innovation Areas
  • Cross-Cutting Technology
  • Suggest a Developer
  • About
  • Log In/Register
  • EPRI.com
  • Copyright Policy
  • Privacy Statement
  • Terms of Use
  • Help / Contact Us
  • EPRI 3420 Hillview Avenue, Palo Alto,
    California 94304

    © Electric Power Research Institute, Inc.
    2001-2023

    All Rights Reserved

Massive Integration of power electronic devices (MIGRATE)
  1. Home
  2. Tech Channels
  3. Integrated Grid
  4. Massive Integration of power electronic devices (MIGRATE)

Massive Integration of power electronic devices (MIGRATE)

  • Overview
  • Project Information
  • IG sponsors Information

Overview

Project Summary

Adapted and lightly edited from: https://www.h2020-migrate.eu/about.html

Context

By 2020, several areas of the High Voltage AC (HVAC) pan-European transmission system will be operated with extremely high penetrations of Power Electronics (PE)-interfaced generators, thus becoming the only generating units for some periods of the day or of the year – due to renewable (wind, solar) electricity. This will result in:

  • growing dynamic stability issues for the power system (possibly a new major barrier against future renewable penetration)
  • the necessity to upgrade existing protection schemes
  • measures to mitigate the resulting degradation of power quality due to harmonics propagation

Overview

European TSOs from Estonia, Finland, France, Germany, Iceland, Ireland, Italy, Netherlands, Slovenia, Spain and UK have joined to address such challenges with manufacturers (GE, Schneider Electric) and universities/research centers. They propose innovative solutions to progressively adjust the HVAC system operations.

First, a replicable methodology is developed for appraising the distance of any EU 28 control zone to instability due to PE proliferation and for monitoring it in real time, along with a portfolio of incremental improvements of existing technologies (the tuning of controllers, a pilot test of wide-area control techniques and the upgrading of protection devices with impacts on the present grid codes). Next, innovative power system control laws are designed to cope with the lack of synchronous machines. Numerical simulations and laboratory tests deliver promising control solutions together with recommendations for new PE grid connection rules, and the development of a novel protection technology and mitigation of the foreseen power quality disturbances. Technology and economic impacts of such innovations are quantified together with barriers to be overcome in order to recommend future deployment scenarios. Dissemination activities support the deployment schemes of the project outputs based on knowledge sharing among targeted stakeholders at EC level.

Project Team

  • Project Lead
    1. TenneT
  • Utilities
    1. Elering
    2. Landsnet
    3. Fingrid
    4. Amprion
    5. Scottish Power Energy Networks
    6. EirGrid
    7. RTE - France
    8. ELES
    9. Terna Group
    10. Red Electrica de Espana
  • Research Partners
    1. Tallinn University of Technology
    2. Leibniz University Hanover
    3. Technical University of Berlin
    4. University of Manchester
    5. University College Dublin
    6. Delft University of Technology
    7. TECHNOFI
    8. Swiss Federal Institute of Technology in Zurich (ETH Zurich)
    9. University of Ljubljana
    10. Milan Vidmar Electric Power Research Institute (EIMV)
    11. Ensiel
    12. Research Center for Energy Resources and Consumption (CIRCE)
  • Vendors
    1. GE
    2. Schneider Electric
  • Other Participants or Stakeholders
  • N/A
Loading...

Project Information

Project Information

  • Technology Demonstrated
    1. Residential Solar PV
    2. Commercial Solar PV
    3. Utility-scale Solar PV
    4. Community Solar PV
    5. Sensor Technology
    6. Long-term Forecasting
    7. Telecom
    8. Smart Inverter
  • Demonstration Objectives
    1. TSO/DSO Integration
    2. Reliability Improvement
    3. Voltage Regulation
    4. Ancillary Services - Frequency Regulation
    5. Ancillary Services - Non-Spinning Reserve
    6. Generation Capacity
    7. Price Response/Tariffs
    8. Smart City Infrastructure
    9. Delivery Asset Deferral
    10. Improving Power System Models
  • Related EPRI Programs
    1. P173 - Bulk Power System Integration of Variable Generation
    2. P174 - Integration of Distributed Energy Resources
  • Project Type
    1. Laboratory Testing
    2. Modeling and Simulation

Status

Beginning Date:
December 31, 2015
Ending Date:
December 30, 2019
Project Status:
In Progress
Last Modified:
November 2, 2020

Additional Information

For Additional Information:
  1. https://www.h2020-migrate.eu/
  2. https://cordis.europa.eu/project/rcn/199590_en.html

IG sponsors Information: Learnings and Recommendations

IG sponsors must Log In to view additional information

EPRI.com|Copyright Policy|Privacy Statement|Terms of Use|Help/Contact Us
EPRI
3420 Hillview Avenue, Palo Alto, California 94304 | 800-313-3774
© Electric Power Research Institute, Inc. 2001-2023. All Rights Reserved